HEATING AND PRESSING SECTION

OPERATING:
After trimming and the start given by the worker, ensembled
panel goes at the entry of heating and pressing section, where glass
thickness is checked; panel comes to first oven and to first press,
then comes to the second oven and to the second press for the final
working step. After the unloading through exit tilting table, panels
were put in the specific trolleys (not included in the supply), that
will entry in autoclave to make the needed cycle.
FEATURES AND TECHNICAL DETAILS:
LISEC COSTRUZIONE MACCHINE ITALIA S.R.L.
VIA AQUILEIA 14
31048 OLMI DI S. BIAGIO DI CALLALTA (TV)
ITALY
P. IVA 03289430260
TEL +39 0422 794111 FAX +39 0422 794191
E-mail info@liseccmi.com